艏
1、船的前端或前部
艏线:在罗经及分罗经上,划有一道黑线,以表示艏之方向,称为“艏线”。此线所指之罗经读数,即为船之罗经方向。
艏楼甲板应该有小的舷弧用于排水。
The forecastle deck will have small sheer for drainage.
艏部舱室(舵机房)风管结构交验。
Vent duct structure of bow cabin (steering gear RM.) To be inspection.
你们船有艏侧推器还是艉侧推器?
Do you have bow thruster or stern thruster?
艏,艉尖舱底部为单底结构。
F. P and A. P tank is single bottom structure.
艏部是钢板焊接球鼻形结构。
The stem is of bulbous bow type constructed by welded of steel plates.
设计有一连续的主甲板和艏楼,艉楼。
The ship is designed to have continuous main deck, forecastle and poop.
平板龙骨应与艏柱和艉框架牢固地连接。
The plate keel to be connected firmly with stem and stern frame.
我们船有艏侧推器。
We have bow thruster.
艏尖舱中平台(水平位臵)上的减轻孔应为格栅型。
Lightening holes at platform (in horizontal position) in peak tanks to be grating type.
停止松艏倒缆。
Stop slacking spring forward.
此方法亦可用于船舶横摇、纵摇、艏摇运动的预报。
This method can also be used in ship roll, pitch and heave prediction.
艏锚已备。
Bow anchor (s) standing by.
艏侧推上应安装有刹车以防止航行时螺旋桨和马达发生转动。
The bow thruster to be equipped with a brake to avoid the turning of the propeller and motor during sailing.
露天甲板、艏楼甲板及艉楼甲板等在分段阶段只做一度底漆。
Applied 1st primer coat for expose deck, forecastle deck, poop deck on block stage.
艏制链器到绞链盘滚筒(不是绞缆滚筒)之间是否有一个直接引导器?
Is there a direct lead from the bow stopper to the winch drum (not the warping end)?
当选择了DP模式,当时船舶的位置和艏向被作为参考位置和艏向。
When DP mode is selected, the current position and heading of the vessel are taken as the reference position and heading.
在舰艏甲板上的大型起重机和通信天线桅杆移除被一座跟踪雷达代替。
The large crane and communication mast on the bow deck was removed and replaced by a tracking radar.
上层建筑的前端壁的起始点不宜过于接近船艏,否则会有呆笨的感觉。
The forward end of the superstructure should not be too close to the bow to avoid a sense of clumsiness.
在这种模式下,船舶的艏向是由一个罗盘和由一个声学pme相对分离控制。
In this mode, the vessel heading is controlled by a gyrocompass and the relative separation controlled by an acoustic PME.
本船艏部设有艏侧推装置,消防时可保持船舶定位,并具有良好的视野和回转性能。
This boat is equipped with one bow thruster for position keeping while fire fighting has good viewing tactical turning performance.
一台起锚机和锚链可能会在船艏增加300到600磅的重量,反而会影响船的性能。
A windlass and all-chain rode may add 300-600lb. in the bow and can adversely affect the performance of your boat.
艏尖舱、淡水舱、压载舱、应急发电机组燃油柜采用测量管测量,污油舱使用短测量管。
Fore peak tank fresh water tank ballast tank emergency generator fuel oil tank use sounding pipe sludge tank use short sounding pipe.
该通讯系统完成了实时数据通讯目的,数据传输准确可靠,已应用在艏艉线测量系统中。
The communication system fulfills real-time data communication and data transmitting credibly, has already been-applied in measuring system of the head and end lines of ship.
当心磷艏含量超过50%时,该酶质子泵功能却随心磷脂含量的增加表现出下降的趋势。
When cardiolipin concentration was more than 50%, the enzyme proton-pumping function was no longer increased.
在首部甲板上安装首楼甲板。锚机,系泊配件和锚链管、艏桅杆处等的甲板结构需要加强。
Forecastle deck shall be provided on forward deck. Deck structures in way of windlass, mooring fittings, hawser pipes, foremast etc. shall be reinforced.
本船为钢质双体船,前倾艏柱,方艉圆舭,艏升高甲板单层露天甲板,双主机双螺旋桨双舵。
This vessel is made of steel, catamaran, fore raked stem, transom stern, round bilge, fore raised deck, single open deck, double main engines, double propellers, double rudders.
时间序列分析法亦可用于船舶纵摇、艏摇的时间序列预报,该方法在工程中具有很大的实用价值。
The time series analysis can also be used in ship pitching and heaving time series prediction. These indicate that the prediction method is valuable for engineering practice.
时间序列分析法亦可用于船舶纵摇、艏摇的时间序列预报,该方法在工程中具有很大的实用价值。
The time series analysis can also be used in ship pitching and heaving time series prediction. These indicate that the prediction method is valuable for engineering practice.